When oil wells decrease their production, one of the techniques used for well reactivation is the injection of Nitrogen or Air at high pressure, thereby stimulating the extraction of crude oil from the well.
SIOS participated in this project by developing a hardware and software tool designed to meet the monitoring, reporting, and billing needs of nitrogen injection operations in oil wells.
The client’s issue was a delay of up to 60 days after the service was completed for invoice entry, due to:
To address this issue, we designed a system that consists of custom-developed software running on an industrial PC in a control panel suited to the project’s operating conditions and environment. The entire system was developed with the aim of meeting all PEMEX requirements, so that upon completion of the injection service, the necessary documents for client acceptance of the Work Order can be printed on-site and immediately, resulting in the following benefits:
For more information about the details of the solution, visit: SGR – InSite Report Generator System